James T. Blevins
245 West J. St.
Grants Pass, Oregon
---------------
Pass No. A.9226 1931-1933
J. T. Blevins Asst. B&B Foreman
Portland Division
---------------
Pass No. A 18206 1931-1933
J. T. Blevins Wife & Daughter (Dora)
For Merit, Over Pacific Lines
---------------
Metropolitan Group Life Insurance
Southern Pacific Co.
Serial No. 22658 Group Policy No. 2000G.
Pay Roll No. 414 July 1, 1933
$1200

1931

Jan. 2--Repairs to pipe hand rail bridge
550D Myrtle Creek.
Jan. 2--P.M. Placed plank at county road crossing at Round Prairie--8 hrs.
Jan. 3--Repairs to county road crossings near Dole--8 hrs.
Jan. 5--Repairs to upper end of culvert 553J.
Jan. 5--Repairs to bents, trestle 551K near Myrtle Creek
Jan. 6--Repairs to bents, trestle 551K Myrtle Creek--9 hrs.
Jan. 7--Repairs to bents, trestle 551K in A.M.
Jan. 7--
P.M. made out weekly report etc.--8 hrs.
Jan. 8--Repairs to sills bent 2 trestle 535AA, Byers
Jan. 9--Repairs to bents, trestle 509E, Glendale--8 hrs.
Jan. 10--Repairs to bents, trestle 509E, Glendale--8 hrs.
Jan. 12--Repairs to bents, trestle 509E, Glendale
Jan. 13--Sawing and loading wood for outfits, placed
lock on turntable, writing in office car, Glendale
Jan. 14--Made ladder & placed at bridge 495F
Jan. 14--P.M. made out weekly report Leland--8 hrs.
Jan. 15--Made ladder etc. for east end bridge 495F
Jan. 15--P.M. made out some monthly timber rolls, Leland
Jan. 16--Made ladders etc. for bridge 497B, renailed sidewalk & hand rail--8 hrs. Wolf Creek crossing
Jan. 17--Repairs to culverts 496I, 497G, 498G near Pollard (outfits moved to Gold Hill #223)--8 hrs.
Jan. 19--Unloading material & preparing to renew deck of
bridge 456E Gold Hill--8 hrs.
Jan. 20--Preparing to renew deck bridge 456E, Gold Hill
Jan. 21--Framing guard timbers etc. for bridge 456E
Jan. 21--
P.M. made out weekly & material reports Gold Hill--8 hrs.
Jan. 22--A.M. to Merlin & return on motor car to unload timber.
Jan. 22--
P.M put up stove in station office, Central Point.
Jan. 23--Repairs to chute to stock corral, Central Point
Jan. 23--P.M unloaded & hauled ties for bridge 456E, Gold Hill--8 hrs.
Jan. 24--Hauling material and preparing to renew deck of bridge 456E, Gold Hill--8 hrs.
Jan. 26--Renewing ties in bridge 456E, Gold Hill--8
½ hrs.
Jan. 27--Renewing ties in bridge 456E, Gold Hill--8 hrs.
Jan. 28--Renewing ties in bridge 456E, Gold Hill--8 hrs.
Jan. 29--Renewing ties in bridge 456E, Gold Hill--8 hrs.
Jan. 30--A.M. renewing ties in bridge 456E
Jan. 30--P.M. making out monthly reports in outfit office car, Gold Hill
Jan. 31--Making out monthly reports in outfit office car, Gold Hill--8 hrs.
Feb. 2--Finished monthly reports for January at Gold Hill--8 hrs.
Feb. 3--Renewing ties in bridge 456E, Gold Hill--8 hrs.
Feb. 4--Surfacing deck, trestle 456D etc., Gold Hill--8 hrs.
Feb. 5--Finished placing ties & began on wooden guard timbers bridge 456E, Gold Hill
Feb. 6--Placing wooden guard rail bridge 456E, Gold Hill
Feb. 7--Renewing deck of bridge 456E
Feb. 7--P.M. made out weekly report etc., Gold Hill--8 hrs.
Feb. 9--Renewing sidewalk & hand rail bridge 456E--8 hrs.
Feb. 10--A.M. renewing hand railing bridge 456E, Gold Hill
Feb. 10--P.M. To Grants Pass on local freight, put up stove in freight office--8 hrs.
Feb. 11--Repairs to doors in passenger station, Grants Pass--8 hrs.
Feb. 12--Repairs to platform at freight room, Gold Hill
Feb. 12--P.M. outfits moved from Gold Hill to Glendale--8 hrs.
Feb. 13--Writing material reports etc. in office car B&B gang #1 at Glendale--8 hrs.
Feb. 14--A.M. framed guard timber for trestle 509D
Feb. 14--P.M. Made out weekly report and service monthly time rolls, Glendale--8 hrs.
Feb. 16--Renewing ties in bridge 509D, Glendale
Feb. 17--Renewing ties in bridge 509D, Glendale--8 hrs. (1 crossing of Cow Creek)
Feb. 18--Surfacing trestle 509E, placing guard railing bridge 509D near Glendale---8 hrs.
Feb. 19--Placing guard rails & bolts, bridge 509D--8 hrs.
Feb. 20--Finished renewing deck, bridge 509D--8 hrs.
Feb. 21--Making out reports etc. in office car, Glendale--8 hrs.
Feb. 24--Cleaning up material at trestles 509D&H, loading up outfits & moving from Glendale to trestle 518J and West Fork--8 hrs.
Feb. 25--Hauling timber from West Fork and   preparing to renew deck, trestle 518J--8 hrs.
Feb. 26--A.M. renewed stringers in trestle 518J
Feb. 26--P.M. making out monthly reports in office car B&B gang #1 at West Fork--8 hrs.
Feb. 27--West Fork to Glendale & return on motor car for pay checks. Making out monthly report in outfit office car at West Fork--8 hrs.
Feb. 28--Finished making out monthly reports in office car at West Fork--8 hrs.
Mar. 2--Repairs to caps, trestle 518J, renewed ties on concrete abutment at west end bridge 519H West Fork--8 hrs.
Mar. 3--Repairs to bents, trestles 520A&C West Fork
Mar. 4--Cleaned out  & extended culverts 521E&G, 523G West Fork. Outfits moved to Roseburg.
Mar. 5--Repairs to Lane St. crossing, Roseburg--8 hrs.
Mar. 6--Repairs to Lane St. crossing, Roseburg--8 hrs.
Mar. 7--A.M. repairs to Moser Street crossing, Roseburg
Mar. 7--P.M. made out weekly report etc.--8 hrs.
Mar. 9--Repairs to Moser Street crossing, Roseburg--8 hrs.
Mar. 10--A.M. repairs to Moser Street crossing
Mar. 10--P.M. unloaded timber for repairs to Kinney spur trestle, Roseburg--8 hrs.
Mar. 11--Unload old stringers & repairs to Moser Street crossing, Roseburg--8 hrs.
Mar. 12--Unloaded timbers for trestle 572AA, Roseburg A.M.--8 hrs. & extended & pleud? portals culvert 566 A carnes
Mar. 13--Renewing section yard fence Winchester--8 hrs.
Mar. 14--Made out reports in car, Roseburg--8 hrs.
Mar. 16--Repairs to bulkhead at east end trestle 577A Winchester--8 hrs.
Mar. 17--Repairs to bulkhead trestle 577A Winchester, hauling material etc. for helper bent, trestle 576D--8 hrs.
Mar. 18--Framed and placed helper bent, trestle 576D
Mar. 19--A.M. finished repairs to bent, trestle 576D
Mar. 19--P.M. repairs to bents, trestle 572AA Roseburg--8 hrs.
Mar. 20--Repairs to bents, trestle 572AA Roseburg--8 hrs.
Mar. 21--Excavate around piling for pit plank for sill
Mar. 21--P.M. made out weekly report etc.--8 hrs.
Mar. 23--Repairs to bents, trestle 572AA Roseburg--8 hrs.
Mar. 24--Repairs to bents, trestle 572AA Roseburg--8 hrs.
Mar. 25--Repairs to bents, trestle 572AA Roseburg--8 hrs.
Mar. 26--Repairs to bents, trestle 572AA Roseburg--8 hrs.
Mar. 27--Repairs to bents, trestle 572AA Roseburg--8 hrs.
Mar. 28--Repairs to bents, trestle 572AA Roseburg--8 hrs.
Mar. 30--Making out monthly reports B&B gang #1 in outfit office car, Roseburg--8 hrs.
Mar. 31--Making out monthly reports B&B gang #1 in outfit office car, Roseburg--8 hrs.
Apr. 1--A.M. finished writing monthly reports
Apr. 1--P.M. tepaired sand bin at stock corral, Roseburg
Apr. 2--Repairs to wing fences cattle guards 565C&D, 570F, unloaded materials for platform at stock corral & framing timber for platform, Dillard--8 hrs.
Apr. 3--Renewing loading platform at stock corral, Dillard--8 hrs.
Apr. 4--Renewing loading platform, Dillard--8 hrs.
Apr. 6--Finished stock platform at corral, Dillard
Apr. 6--P.M. planked county road crossing near Myrtle Creek--8 hrs.
Apr. 7--Made out material & weekly report, Roseburg
Apr. 8--Put up cattle guard wing fences near Edenbower, cleaned up old crossing plank in yard at Roseburg--8 hrs.
Apr. 9--Outfits moved Roseburg to Drain, hauled timber to repair deck of trestle 608CC on wye, Drain--8 hrs.
Apr. 10--Renewing ties in trestle 608CC, Drain--8 hrs.
Apr. 11--Renewing ties & guard rails, trestle 608CC, Drain
Apr. 13--Renewing guard rails & bolts, trestle 608CC, Drain
Apr. 14--Making out reports in office car, Drain--8 hrs.
Apr. 15--Repairs to caps & sills, trestle 608CC, Drain--8 hrs.
Apr. 16--Renewed culvert 611B near Leona--8 hrs.
Apr. 17--Repairs to upper end, culvert 619B near Comstock
Apr. 18--Finished repairs to culvert 619B, renewed cap in trestle 609E, Drain--8 hrs.
Apr. 20--Renewed shims in trestle 606A & removed cattle guard 604A main line, Yoncalla--8 hrs.

1932

Mar. 17--A.M. repairs to roof of outfit car SP MW3318
Mar. 18--Hauling S.H. material from trestle 576A Winchester to trestle 573B, Roseburg--8 hrs.
Mar. 21--A.M. repairs to deck, trestle 578C, Winchester
Mar. 21--P.M. made out weekly report in office car, Roseburg
Mar. 22--Roseburg to Grants Pass on train 33 to unload material for trestle 474A, Grants Pass to Glendale on train #34 to unload material for trestle 509H--16
¼ hrs.
Mar. 23--Unloaded S.H. stringers for repairs to trestle 509H, Glendale to Roseburg on Train #8--8 hrs.
Mar. 24--Repairs to ties in deck of trestle 578C, Winchester
Mar. 28--Repairs to guard railing, trestle 578C, Winchester
Mar. 29--Repairs to guard railing, trestle 578C, Winchester
Mar. 30--Making out monthly reports in office car B&B gang 1, Roseburg--8 hrs.
Mar. 31--Made out monthly reports in office car B&B gang 1, at Roseburg--8 hrs.
Apr. 1--Finished monthly reports in office car
Apr. 1--P.M. assisted to repair stock  corral at Roseburg--8 hrs.
Apr. 2--Repairs to deck & bents, trestle 577A, Winchester
Apr. 4--Repairs to stock corral at Roseburg--8 hrs.
Apr. 5--Repairs to stock corral, Roseburg and unloaded material for trestle 567D & 568A, Green--8 hrs.
Apr. 6--Repairs to stock corral, Roseburg--8 hrs.
Apr. 7--Repairs to stock corral, Roseburg--8 hrs.
Apr. 8--A.M. made out weekly report etc.
Apr. 8--P.M. repairs to stock corral, Roseburg--8 hrs.
Apr. 9--Repairs to stock corral, Roseburg--8 hrs.
Apr. 11--Repairs to stock corral, Roseburg--8 hrs.
Apr. 12--Finished repairs to stock corral, Roseburg--8 hrs.
Apr. 13--Repairs to deck of trestle 573B, Roseburg--8 hrs.
Apr. 14--Repairs to deck, trestle 573B, Roseburg--8 hrs.
Apr. 15--Made out weekly & some monthly reports, Roseburg--8 hrs.
Apr. 16--Framing ties for deck bridge 573A, Roseburg--8 hrs.
Apr. 18--Framing & placing ties, bridge 573A, Roseburg--8 hrs.
Apr. 19--Framing & placing ties, bridge 573A, Roseburg--8 hrs.
Apr. 20--Making out monthly reports in office car B&B gang #1, Roseburg--8 hrs.
Apr. 21--Repairs to bents, trestle 568A, Green--8 hrs.
June 16--Surfaced trestle 584D near Deady
June 16--P.M. repaired crossing on Associated Oil spur at Edenbower--8 hrs.
June 17--Moving outfits Roseburg to Grants Pass, writing reports, etc.--8 hrs.
June 18--Placed rock riprapping at lower end of culvert 476A near Granite--8 hrs.
June 22--Made out weekly report, material reports etc. in office car, Grants Pass--8 hrs.
June 23--Repairs to deck, trestle 474A, Grants Pass
June.24--Making out monthly reports in office car B&B gang #1, Grants Pass--8 hrs.
June 25--Finished monthly reports etc. in  office car at Grants Pass--8 hrs.
July 1--Repairs to deck, trestle 474A, Grants Pass--8 hrs.
July 2--Repairs to culverts between Grants Pass and Rock Point--8 hrs.
July 6--Repairs to culverts 470L & 471D & trestle 459A, unloaded timber & framed  caps for trestle 456D, Gold Hill--8 hrs. 
July 7--Made out material & weekly reports etc. in office car, Gold Hill--8 hrs.
July 13--Hauling timber and renewing sills trestle 456E, Gold Hill--8 hrs.
July 14--Renewing sills, trestle 456E, Gold Hill--8 hrs.
July 15--A.M. made out weekly reports etc.
July 15--P.M. renewing caps, trestle 456E, Gold Hill
July 16--Renewing caps, trestle 456E--8 hrs.
July 20--Renewing caps, trestle 456E, Gold Hill--8 hrs.
July 21--Renewing caps, trestle 456E--8 hrs.
July 22--Renewing cap & pony bent, trestle 456E--8 hrs.
July 23--Renewed sill, brace post and surfaced trestle 456E, Gold Hill--8 hrs.
July 25--Replacing ties in trestle 456E, Gold Hill
July 26--Repairs to street crossings, Medford, and culverts 444A&B near Central Point
July 27--A.M. moved shelter boot from Von der Hellen's pit to Gold Hill
July 27--P.M. repairs to riprapping at bridge 456F, Gold Hill--8 hrs.
July 28--Making out monthly reports in office car B&B gang #1, Gold Hill--8 hrs.

1933
Jan. 3--Repairs to deck of trestle 608G, Drain--8 hrs.
Jan. 4--Repairs to deck of trestle 608G--8 hrs.
Jan. 5--Repairs to deck & taking down old bent, trestle 608G, Drain--8 hrs.
Jan. 6--Framing guard rails for trestle 608G, Drain--8 hrs.
Jan. 7--A.M. framed guard rails for trestle 608G
Jan. 7--P.M. made out weekly report, Drain
Jan. 9--Repairs to deck & bents, trestle 608G Drain--8 hrs.
Jan. 10--Repairs to deck & bents, trestle 608G
Jan. 11--Repairs to bents, trestle 608CC, Drain--8 hrs.
Jan. 12--Renewed culverts 620D & 621A near Divide--8 hrs.
Jan. 13--Repairs to caps and bents, trestle 616C, Curtin--8 hrs.
Jan. 14--Made out semimonthly time rolls, material & weekly reports, Drain
Jan. 16--Loading S.H. materials & cleaning up, preparing to move, Drain--8 hrs.
Jan  17--Renewed top caps in trestle 605C, 606B&C near Boswell Springs--8 hrs.
Jan. 18--Repairs to surface & line trestles 602A & 600J, outfits moved from Drain to Oakland
Feb. 1--Framed ties for bridge 587G, Oakland--8 hrs.
Feb. 2--Framing ties for bridge 587G, Oakland
Feb. 3--Placing ties in deck of bridge 587G--8 hrs.
Feb. 4--Placing ties in deck of bridge 587G--8 hrs.
Feb. 6--Finished repairs to deck 587G
Feb. 6--P.M. hauled material from Oakland to trestle 590E for repairs to caps etc.--8 hrs.
Feb. 7--Renewing caps, trestle 590E, Oakland
Feb. 8--A.M. made out weekly reports etc.
Feb. 8--P.M. repairs to stock corral, Oakland--8 hrs.
Feb. 9--Repairs to stock corral, Oakland--8 hrs.
Feb. 10--Repairs to stock corral, Oakland--8 hrs.
Feb. 11--Renewing caps, trestle 590E, Oakland--8 hrs.
Feb. 13--Renewing caps, trestle 590E, Oakland--8 hrs. 
Feb. 14--Repairs to ties & deck, trestle 590E, Oakland--8 hrs.
Feb. 15--Made out weekly report & semimonthly time rolls, outfits moved from Oakland to Roseburg assisted to unload timber from train 623 at trestle 578A, Winchester--8 hrs.
Feb. 16--Writing up monthly reports in office car, Roseburg--8 hrs.
Feb. 17--Repairs to surface, trestle 573D, 1 mile east of Roseburg--8 hrs.
Feb. 18--Made out monthly reports in office car at Roseburg--8 hrs.
Mar. 1--Repairs to surface, trestle 573D, Roseburg--8 hrs.
Mar. 2--Repairs to caps, trestle 578C, Winchester
Mar. 3--Repairs to pilings trestle 573D, Roseburg--8 hrs.
Mar. 4--Renewing caps in trestle 578A, unloaded material at trestles 577A&F, Winchester--8 hrs.
Mar. 16--Renewing caps, trestle 578A, Winchester--8 hrs.
Mar. 17--Renewing caps, trestle 578A, Winchester--8 hrs.
Mar. 18--Renewing caps & splicing piling, trestle 578A&C, Winchester--8 hrs.
Mar. 20--Renewing caps in trestle 578C, Winchester
Mar. 21--A.M. made out weekly report etc.
Mar. 21--P.M. framing ties for bridge 573A, Roseburg
Mar. 22--Framing ties for bridge 573A, Roseburg--8 hrs.
Mar. 23--Framing ties for bridge 573A, Roseburg--8 hrs.
Mar. 24--Framing ties for bridge 573A, Roseburg--8 hrs.
Mar. 25--Framing & placing ties, bridge 573A--8 hrs.
Mar. 29--Placing ties in bridge 573A, Roseburg--8 hrs.
Mar. 30--Making out monthly reports in office car B&B gang #1 at Roseburg--8 hrs.
Mar. 31--Finished monthly reports in office car, gang #1, Roseburg--8 hrs.
Apr. 3--Renewing hand railing, bridge 573A, Roseburg--8 hrs.
Apr. 4--Roseburg sidewalk, bridge 573A--8 hrs.
Apr. 5--Repairs to piling in trestle 573D--8 hrs.
Apr. 6--Repairs to piling, trestle 573D--8 hrs.
Apr. 7--Repairs to bents and hauling material, trestle 573D, Roseburg--8 hrs.
Apr. 8--A.M. renewed sill, bent #21, trestle 573D
Apr. 8--P.M. made out weekly report etc., Roseburg
Apr. 14--Loading S.H. material to ship to Rice Hill for removing turntable
Apr. 14--P.M. repairs to Lane Street crossing, Roseburg.
Apr. 15--Writing semimonthly time rolls, materials, weekly reports in office car, Oakland--8 hrs.
Apr. 17--Removing turntable, Rice Hill--8 hrs.
Apr. 18--Removing turntable & assisting lineman to raise telegraph poles, Rice Hill--8 hrs.
Apr. 19--Removing turntable, Rice Hill--8 hrs.
Apr. 20--Loading timbers at turntables at Rice Hill
Apr. 20--P.M. repairs to trestle 592D near Oakland
Apr. 21--Repairs to caps and bulkheads, trestle 592D near Oakland--8 hrs.
Apr. 22--Made out material, weekly reports etc. in outfit office car, Oakland--8 hrs.
Apr. 24--Unloaded material etc. for removing girders, bridge 608AA on wye, Drain--8 hrs.
Apr. 25--Preparing to remove steel girders, bridge 608AA on wye, Drain--8 hrs.
Apr. 26--Framing piling for falsework for removing girders, bridge 608AA, Drain--8 hrs.
Apr. 27--Placing falsework for removing girders, bridge 608AA, Drain--8 hrs.
Apr. 28--Making out monthly reports etc. in outfit office car, Drain--8 hrs.
Apr. 29--Finished making out monthly reports in outfit office car, Drain--8 hrs. 
May 1--Placing falsework for removing girders, bridge 608AA, Drain--8 hrs.
May 2--Placing falsework for removing girders, bridge 608AA, Drain--8 hrs.
May 3--Placing falsework for removing girders, bridge 608AA, Drain--8 hrs.
May 4--Placing falsework, bridge 608AA, Drain
May 5--Driving out rivets in girders, bridge 608AA, Drain--8 hrs.
May 6--Preparing to remove girders, bridge 608AA, renewed sill, trestle 608CC, made out weekly report, Drain--8 hrs.
May 8--Drain to trestle 616C, Curtin, with motor & push cars and tools--2
½ hrs.
May 9--Assisting to load girders, bridge 608AA, Drain, and turntable at Rice Hill, with Eugene workers and loco crane--8 hrs.
May 10--Loading girders with loco crane, bridge 608AA, Drain--8 hrs.
May 11--Loading steel girders, bridge 608AA
May 12--Loading girders & lumber, bridge 608AA, Drain--8 hrs. 
May 13--A.M. loaded S.H. material released from bridge 608AA
May 13--P.M. made out weekly report--8 hrs.
May 15--Moving material from bridge 608AA, Drain
May 15--P.M. unloading material and placing guard railing, trestle 616C, Curtin--8 hrs.
May 16--Placing creosoted caps in m
ain line trestle 616C, Curtin--9½ hrs.
May 17--Placing sash girts & sway braces, new bents, trestle 616C, Curtin--9 hrs.
May 18--Finished placing lumber etc. at trestle 616C, Curtin--8 hrs.
May 19--Loading S.H. material to ship to Oakland, loading signal tool house on push cars to move to Oakland, Drain--8 hrs.
May 20--Made out material, weekly reports etc. in office car Drain--8 hrs.
May 22--Placed sway braces, trestle 603A, spliced two pilings, trestle 606C near Yoncalla--8 hrs.
May 23--Repairs to flume at lower end culvert 597B, placed guard rail bolts in trestle 594E, Isadora, spiked line, bridge 589J, Oakland--8 hrs.
May 24--Repairs to posts under water tank, Oakland, moved into SP MW 255--8 hrs.
May 25--Repairs to bents, trestle 594C, Isadora--8 hrs.
May 26--Placing bolsters etc. on cars under turntable at Rice Hill to ship to Brooklyn--8 hrs.
May 27--Placing bolsters & iron on cars under girders from bridge 608AA, Drain--8 hrs.
May 29--Making out monthly reports in office car at Oakland--8 hrs.
May 31--Finished monthly reports in office car at Oakland--8 hrs.
June 1--Fastened steel girders to car to ship to West Oakland & Bakersfield, Cal., removed from bridge 608AA, Drain
June 2--Repairs to bents, trestle 594C near Isadora
June 3--Repairs to bents, trestle 594C near Isadora--8 hrs.
June 5--Repairs to bents, trestle 594C--8 hrs.
June 6--Repairs to bents, trestle 594C--8 hrs.
June 7--Repairs to bents, trestle 594F&D near Isadora--8 hrs.
June 8--Made out material & weekly reports in office car, Sutherlin--8 hrs.
June 9--Repairs to top culvert 592A near Oakland--8 hrs.
June 10--Made out reports in office car, Sutherlin
June 19--Renewing ties, trestle 582B near Wilbur--8 hrs.
June 20--Renewing ties & guard railing, trestle 582B--8 hrs.
June 21--Renewing guard railing, trestle 582B--8 hrs.
June 22--Made out weekly report etc. in office car at Sutherlin--8 hrs.
June 23--Repairs to caps & bents, trestle 582B near Wilbur--8 hrs.
June 24--Repairs to deck, trestle 582B & to extensions to stone culvert 583E near Deady--8 hrs.
June 30--Made out monthly reports in office car, Sutherlin--8 hrs.
Aug. 1--Repairs to bent & etc, trestle 520A--8 hrs.
Aug. 2--Framing ties for bridge 519H West Fork--8 hrs.
Aug. 3--Framing ties for bridge 519H--8 hrs.
Aug. 4--Framing ties for bridge 519H--8 hrs.
Aug. 5--Repairs to helper bent, trestle 518J, renewed culvert 518F near tunnel #3--8 hrs.
Aug. 7--Renewing ties in deck, bridge 519H--8 hrs.
Aug. 8--Renewing ties in bridge 519H
Aug. 8--P.M. made out weekly report, West Fork--8 hrs.
Aug. 9--Renewing guard railing, bridge 519H
Aug. 9--P.M. renewed culvert 518D near tunnel #3--8 hrs.
Aug. 10--Renewed warning signal at east end of tunnel #3, renewing caps on trestle 515G near tunnel #5--8 hrs.
Aug. 11--Renewed caps in trestle 515G--8 hrs.
Aug. 14--Repair to culvert 516F, Brandt, 522F&G,West Fork trestle 529F. Table Creek. benchmark near East Switch Peak, outfit moved West Fork to Riddle--8 hrs.
Aug. 15--Made out semimonthly time rolls, material & weekly reports, Riddle--8 hrs.
Aug. 16--Repairs to deck, trestle 542B, Riddle, framing stringers, trestle 529F, Cornutt
Aug. 17--Framing & placing stringers, trestle 539E, Cornutt, Riddle to Grants Pass, train 623
Aug. 18--Repairs to turntable at Grants Pass--8 hrs.
Aug. 21--Renewed culvert 552B near Myrtle Creek, repaired Oak Street crossing, Roseburg, returned to outfit at Riddle on train 623--8½ hrs.
Aug. 22--Made out material & weekly reports in office car, Riddle--8 hrs.
Aug. 23--Riddle to Glendale motor car
Aug. 23--P.M. cleaning roof of storage oil tank--8 hrs.
Aug. 24--A.M. cleaning piling & sanding roof of storage oil tank, Glendale
Aug. 24--P.M. to Grants Pass on motor car--8 hrs.
Aug. 25--Unloaded material & excavating at bents, trestle 474A
Aug. 25--P.M. writing monthly reports in office car, Grants Pass--8 hrs.
Aug. 26--Finished monthly reports in office car at Grants Pass--8 hrs.





  